Overpass 403 on the A1
Woźniki-Częstochowa
The specificity of the project:
The structure was aimed at a impact-free routing of car traffic over the Mała Panew river, DP 2335S district road and an animal migration route.
- Theoretical span: Lt = 35.0 + 3 × 50.0 + 35.0 = 220.0 m,
- Length of the structure: 221.2 m,
- Width of the structure: 38.5 m.
The load-bearing structure was designed as a post tensioned beam structure based on reinforced concrete pillars and reinforced concrete abutments. Two separate load-bearing structures for each direction of traffic are five-span structures with 3 main beams made of prestressed concrete.
We cooperate with: