Bridge over Vistula in Kiezmark

The specificity of the project: 

The access spans on the left bank (1-8) will be constructed using the Movable Scaffolding System (MSS). The span on the right bank (12) together with the support of span 11 are made on a stationary scaffolding. 
The in-water span (10) and adjacent spans (9-11) will be constructed using the balanced cantilever method with the use of two temporary supports at each starting support (P10 and P11). 
  • Length of the structure: 928.70 m, 
  • Width of the structure: 16.18 L + 16.18 P, 
  • Number of spans: 12, 
  • Span arrangement: 68.0 + 7 x 70.5 + 91.0 + 130.0 + 91.0 + 52.0, 
  • Number of roadways: 2, 
  • Road profile in plan: straight, 
  • Amount of concrete in the superstructure: 26 754.4 m3 + bridge deck overhang 685.5 m3 + approach slab 206 m3
  • Prestressing steel: 1 353 942.0kg, 
  • Reinforcement steel: 5 426 044.0 kg + bridge deck overhang 105 915.3 m3 + approach slab 41 168 kg, 
  • Total ceiling area: 42 812 m2